Re: Northumberland Development Project
That made me chuckle. Modern life, eh? I bet the Romans didn't bother with identifying and properly tagging Neolithic burial sites before leveling the site of the Colosseum or the Circus Maximus: why do modern Italians have to bother?
Finally, some solid f**king news. That single tier end was the best part of our stadium, and is one of the two things I would insist be included in the new stadium plans, the other being the stands sitting as close to the pitch as possible. Other than that, even though it will mean yet more delays (which I've previously gotten quite upset about, meaning as it does that we'll have a routinely recurring Gareth Bale saga in even more transfer windows), if it helps increase our capacity to as close to the 65,000 mark as possible, is architecturally distinctive (a la the Stade des Lumieres, for example) and incorporates the possibility of converting to all or partial standing areas in the future, then the delays will be worth enduring.
We'll see. Both Rome clubs have been trying to build grounds for decades, but everytime they identify a site, the archeologists find important staff and the plans get scuppered. A problem of being in the eternal city I guess.
That made me chuckle. Modern life, eh? I bet the Romans didn't bother with identifying and properly tagging Neolithic burial sites before leveling the site of the Colosseum or the Circus Maximus: why do modern Italians have to bother?
*coughs*
From Skys****ercity.com
THST Official @THSTOfficial
THST has met with THFC Executives this evening. Stadium Update: The single tier 'kop' end stays in the new plans. There is a commitment to fan consultation moving forward from the Club.
https://twitter.com/THSTOfficial
and in answer to a question....
They [the KSS plans] are now 5 years old. Consultation [with fans] will cover far more areas than the interior design alone.
Also
THST Official @THSTOfficial 3h
@messerp1 @Simongates251 There's no need for further planning permission.
Finally, some solid f**king news. That single tier end was the best part of our stadium, and is one of the two things I would insist be included in the new stadium plans, the other being the stands sitting as close to the pitch as possible. Other than that, even though it will mean yet more delays (which I've previously gotten quite upset about, meaning as it does that we'll have a routinely recurring Gareth Bale saga in even more transfer windows), if it helps increase our capacity to as close to the 65,000 mark as possible, is architecturally distinctive (a la the Stade des Lumieres, for example) and incorporates the possibility of converting to all or partial standing areas in the future, then the delays will be worth enduring.