Wow. That's a sh!t load of steel and some beautiful engineering.
I suppose there is gonna be a big convoy of lorries on the M1 at some stage?
SCX Special Projects - the bespoke precision engineering arm of the family-run SCX Group based in Wincobank, Sheffield - is preparing to install the movable grass pitch over a 12-week period from October.
http://www.tottenhamhotspur.com/new...ing-retractable-pitch-for-new-stadium-070917/
That should have course be anywhere from 3 to 7 weeks from now. I'm guessing it will be done at night to avoid traffic. Since each load is of a considerable size it will take time to manoeuvre them onto the site. Don't think we'll see more than a few delivered each night.